| Water Management The rainfall in Waihi is relatively high, averaging 2,147 mm/year, and unlike many mines around the world which are operated in dry climates, the Martha Mine site operates with a net surplus of water. Because of this net water surplus, water management is an integral part of operations, and the Water Treatment Plant exists to treat surplus water prior to discharge to the Ohinemuri River. Water Sources . |
||||||||
![]() |
Mine Water Mine water is derived from the dewatering of the open pit (1 & 2) and represents one of the major sources of water on site. It comprises both groundwater (1) inflow into the open pit, and surface water (2) generated both in the pit and in the adjacent surface facilities area. Mine water is characterised by the presence of sulphates and metals, predominantly iron and manganese, in solution. Extended Project consents allow up to a maximum of 15,000 cubic metres a day of water, or an annual average of 10,000 cubic metres per day, to be pumped from the open pit. Decant Water |
|||||||
| Underdrainage Water An extensive underdrainage system exists beneath the Waste Rock Embankments (5). The underdrainage system collects both upward rising groundwater beneath the tailings storage facilities, and drainage from the tailings and the embankments. Initially, underdrainage tends to contain a high proportion of tailings seepage. Over time, as the tailings depth increases and the permeability decreases, the volume of tailings seepage decreases. There is an accompanying decrease in the cyanide concentration so that after a period of time, underdrainage water does not need to be treated for cyanide destruction at the Water Treatment Plant. Stormwater Runoff Collection ponds capture water that may require treatment. For example, collection ponds collect water from:
Water collected from the above sources is tested and if it meets the discharge criteria, it is released into the Ohinemuri River. Water which requires treatment is directed to the Water Treatment Plant (8) to ensure it meets the required standards prior to release (9). The collection ponds are sized to collect the runoff arising from a 10 year, 72 hour storm, and appropriate pumping systems are put in place to direct the water to the Water Treatment Plant. This is to ensure that, in the worst case, discharges from the collection ponds will not elevate in-river metals concentrations to above the USEPA chronic guideline values, and therefore will not cause significant adverse environmental effects on the river or its aquatic biology. In practice, the collection pond water quality is greatly improved by regular liming and sealing of PAF areas, and by carrying out progressive rehabilitation. Collection ponds that contain acceptable water quality can be reclassified as silt ponds, and the water can be discharged directly to the river. This, however, is subject to continuous water quality monitoring being carried out to prevent an out-of-specification discharge. In contrast to the collection ponds, silt ponds tend to pick up runoff that may carry suspended solids, but that does not generally contain chemicals or metals. Often silt ponds exist in areas of general construction where no PAF material is present in the catchment, and the silt ponds are similar to those that can be seen in other construction areas, like housing subdivisions. The suspended solids can be removed by gravity settling within the silt ponds. Based on settling trials, the silt ponds are designed to provide a retention time of two hours for runoff generated during a two year return period storm event. In storm events greater than the two year, two hour storm, the silt ponds will overflow. However, as described in the Water Treatment Plant section, the sediment solids concentration in the Ohinemuri River increases as the river flow increases. The compliance limits placed on suspended solids concentrations from silt ponds take this into account. Monitoring and inspections are carried out on a regular basis to ensure that the water contained in both the silt ponds and the collection ponds is being managed appropriately. Silt collects in both the silt ponds and the collection ponds and this needs to be cleaned out on a regular basis to ensure that the ponds continue to operate efficiently. The Water Management System
Reduction, Reuse and Recycling of Water Reuse
Containment Systems and Alarms
These pipelines cross the Ohinemuri River adjacent to the Mill Bridge. Measures are in place to ensure that, in the event of leakage or breakage from pipelines, the material cannot spill into the river. These measures include:
Buffer Storage and Flow Management
In order for sufficient buffer storage to be maintained, some planning needs to be incorporated in the water management system. Such planning needs to take into account the mine schedule, which will dictate the predicted depth of mining within the open pit and consequently the required dewatering rate. Similarly, the water management system needs to take into account the construction schedule for the waste rock embankments, and the expected rate of tailings production. This will ensure that adequate freeboard is maintained on the tailings pond. The planning also needs to take into account the river flow. In summer, when the river flows are lower, the amount of water that can be discharged from the Water Treatment Plant also reduces. The weather in Waihi can be unpredictable, and site water management needs to be conservative and flexible to allow changes to be made that are appropriate to the weather and operational requirements. Similarly, sufficient capacity needs to be provided, particularly in the collection ponds, to prevent out-of-specification discharges. For this reason, pumping facilities must be sized adequately to allow pond levels to be reduced quickly, in response to rainfall and river flow. Monitoring on Site
This data is integral to the daily management of the site. It can affect, for example, decisions made about water types to be treated through the Water Treatment Plant. While much of the monitoring is required by the consent conditions, regular monitoring is recognised as being good practice. It allows the formation of a database so that trends can be monitored, and any unusual results can be investigated. Long term monitoring data also provides confirmation that the mixing and modelling studies carried out for the lake and the tailings ponds continue to be accurate. Monitoring of water quality and flows from the individual drains beneath the tailings storage facilities provides a good indication of their performance over time, allowing predictions of likely future performance to be made. This is an important issue for mine closure. For more information see Closure and Post Closure. Monitoring of Rivers and Streams |
||||||||
![]() |
||||||||