rehabilitation & closure | from open pit to recreational lake | from Waste Disposal Area to pasture, plantings and ponds | rehabilitation - other areas | closure and post closure |
||||||||
| Rehabilitation: other areas Crushing and Conveying System At the completion of mining, the crushers will be dismantled, and the crusher slot backfilled. The conveyor, transfer towers and loadout system will be dismantled and removed. With respect to the conveyor, the Mining Licence states: At the completion of mining, a decision will be made as to ultimate use of the conveyor route. If the area was to be restored to its former condition, it would be recontoured, landscaped and revegetated. If it was decided that a walkway should be developed, the walkway area would be appropriately surfaced. It is possible that a walkway could link the whole site, and join with other walkways to include other areas of interest. Regardless of the decision made, it is expected that for maintenance and long term safety reasons, the conveyor tunnel under Union Hill would be blocked off at both ends with concrete plugs. |
||||||||
![]() |
Processing Plant While the Processing Plant site could be restored to productive pasture, it is possible that some equipment could be left in place that could be incorporated into a walkway system. Regardless of that decision, it is expected that most, if not all equipment, structural steel and tanks will be dismantled and removed. All concrete less than a metre below the surface will be broken up and removed. The area will be recontoured. Topsoil and fertiliser will be applied as necessary prior to seeding with agricultural grasses and legumes to establish pasture. Water Treatment Plant The Water Treatment Plant is expected to be needed for a period of time after closure. It may be required to treat water from various sources including stormwater runoff from various areas like the Water Treatment Plant and the Waste Rock Embankments, water from the tailings pond(s) and underdrainage from the tailings storage facilities, as necessary. Once closure is complete, the Water Treatment Plant will be transferred to the Trust. |
|||||||
above: At the completion of the project the conveyor route will be restored to its former condition, or it could be turned into a walkway. |
||||||||
![]() |
||||||||
[index | gold & silver | history I geology I mining @ Martha I rehabilitation I safety health environment I Martha & the community | economics & employment | tech info | what's new? I links to other sites I glossary ] [ RETURN TO TOP ] |
||||||||